IronRidge’s Installing on Pitched Roof – Tile – Course - Self Study
About this course
While IronRidge products are mentioned in this course, it's not just a product training. This is a valuable learning opportunity even if you're not an IronRidge customer. This is a great for people who are relatively new and want to be productive on the job right away.
Ready To Sign Up Today? Click Here to Enroll
Course outline
15 modules • 87 assignments • 2 - 3 hours to complete • 1:48 hours of video lectures
Welcome • 2 assignments
Orientation Materials
- Introduction to IronRidge (03:00 minutes)
- About IronRidge Installer Certification
Module 1 • 9 assignments
Introduction to Tile Roofs
- Tile Roof Intro (40 seconds)
- Tile Roofing Terms (01:35 minutes)
- Tile Roofing Codes & Standards (IRC 905.3.7) (01:23 minutes)
- Roofing Manufacturer's Installation Instructions (35 seconds)
- TRI - Who They Are, What They Do (01:17 minutes)
- Tile Underlayment (01:37 minutes)
- Tile Types and Profiles (02:45 minutes)
- Tile Attachment (01:45 minutes)
- Tile Coursing (01:27 minutes)
Module 2 • 6 assignments
Flashing
- Tile Flashing Guidelines (34 seconds)
- Penetrating Tiles (20 seconds)
- Tile Attachment Options (33 seconds)
- Deck-Level Flashing (49 seconds)
- Bibbing (01:26 minutes)
- Three-Course Method (59 seconds)
Module 3 • 6 assignments
Evaluating Tile Roofs
- Qualifying a Tile Roof (02:18 minutes)
- Look for Existing Roof Leaks (51 seconds)
- Watch for Hip Truss Issues (01:34 minutes)
- Battens vs. Direct Deck (31 seconds)
- Age and Condition of the Tile (01:20 minutes)
- Examine the Valleys and Ridge Caps (01:02 minutes)
Module 4 • 6 assignments
Safety & Roof Preparation
- Safety on Tile Roofs (41 seconds)
- Walking on Tiles (01:06 minutes)
- Removing Tiles (01:26 minutes)
- Grinding and Cutting Tiles (01:15 minutes)
- Cutting a Pass Through (25 seconds)
- Notching a Weather Lug (46 seconds)
Module 5 • 6 assignments
Mounts & Attachments
- Solar Mounts for Tile Roofs (26 seconds)
- Tile Hooks (55 seconds)
- Tile Replacement Mounts (56 seconds)
- Post Style Attachments (01:11 minutes)
- Choosing a Roof Attachment (02:07 minutes)
- The Inset Method (45 seconds)
Module 6 • 12 assignments
Design and Site Preparation
- Preparing for Installation (52 seconds)
- Design Considerations (45 seconds)
- Required Tools and Supplies (50 seconds)
- Roofing Sealant (01:36 minutes)
- Project Plans (45 seconds)
- Module Orientation (33 seconds)
- Roof Zones (01:51 minutes)
- Know Your Jobsite (59 seconds)
- Ladder Placement (02:51 minutes)
- Identifying Roof Hazards (01:13 minutes)
- Preparing Tools and Materials on the Ground (59 seconds)
- Staging Materials on the Roof (01:56 minutes)
Module 7 • 9 assignments
Laying out the Array
- Marking Array Dimensions (28 seconds)
- Identifying the Array Location (02:38 minutes)
- Determining Module Clamping Zones and Rail Spacing (02:36 minutes)
- Determining Attachment Locations (48 seconds)
- Staggered Attachments (28 seconds)
- Determining Rail Cantilever (25 seconds)
- Determining Rafter Locations (01:41 minutes)
- Locating Missed Rafters (01:14 minutes)
- Marking Attaching Locations (02:12 minutes)
Module 8 • 7 assignments
Tools and Materials
- Installing Tile Replacement Attachments (19 seconds)
- Required Tools and Materials (56 seconds)
- Drilling Pilot Holes (01:36 minutes)
- Installing Knockout Tile Base (34 seconds)
- Optional Deck Level Flashing (15 seconds)
- Installing Knockout Tile Replacement Flashing (55 seconds)
- Installing Knockout Tile L-Foot (36 seconds)
Module 9 • 1 assignments
Tile Hooks
- Installing Tile Hooks (02:25 minutes)
Module 10 • 11 assignments
Racking Installation
- Installing Flush Mount Racking (18 seconds)
- Rail Options (58 seconds)
- Determining Rail Lengths and Making Cut List (02:07 minutes)
- Cutting Rails (01:15 minutes)
- Splicing Rails (41 seconds)
- Expansion Joints (36 seconds)
- Mounting Rails to Roof Attachments (51 seconds)
- Squaring & Levelling Rails (01:56 minutes)
- Attaching MLPE Devices (02:20 minutes)
- Array Grounding and Bonding (01:42 minutes)
- Housekeeping (33 seconds)
Module 11 • 3 assignments
Wire Management
- Wire Management (04:10 minutes)
- Rooftop Junction Boxes (01:26 minutes)
- Tile Conduit Mounting (01:43 minutes)
Module 12 • 4 assignments
Modules
- Module Installation (01:36 minutes)
- Module Wire Management (01:07 minutes)
- Handling Modules (01:29 minutes)
- Installing Modules and Connecting MLPE Devices (04:19 minutes)
Module 13 • 4 assignments
Aesthetics and Summary
- Array Aesthetics (56 seconds)
- Hidden End Clamps (01:39 minutes)
- End Cap Installation (19 seconds)
- Summary (21 seconds)
Conclusion • 1 assignments
Feedback and Additional Resources
- Feedback: 2-minute Exit Survey
Author
-
IronRidge Training Team
Whether you’re a new entrant to the solar industry, training your crew, or just refreshing your credentials, the IronRidge Installer Certification Program was built for you. Learn more